BBI has a six-track railway station with three platforms directly below the terminal with excellent connections to downtown Berlin and the surrounding region. The underground BBI Railway Station measures a total of 405 metres in length and 60 metres in width. It has two platforms for regional and inter-city trains as well as a platform for S-Bahn trains. Construction work began in July 2007.
wiecej
The terminal with its divided facades and clear geometric forms continues architectural elements ranging from the Prussian designer Karl Friedrich Schinkel to the Bauhaus style. The central access road, which will be an avenue lined with trees, picks up characteristic features from the townscapes and countryside of the Berlin/Brandenburg region.
wiecej
The Infotower has been the centrepiece of construction marketing since November 2007 and is situated right on the construction site. The Infotower offers visitors a fascinating view over Europe’s biggest airport construction site from a height of 32 metres. Berlin Airports was able to welcome already 200.000 visitors till today at the Infotower. All the latest information on construction progress can be seen in the visitor pavilion, adjacent to the observation tower.
wiecej
The architectural and technical design of the new control tower of DFS Deutsche Flugsicherung GmbH is in line with the conditions and requirements of Berlin Brandenburg Airport. The newly developed elliptic tower with just four supports offers room for eleven workers.
Client and operator: DFS Deutsche Flugsicherung GmbH
Architect: Franz Ondra (Stuttgart Architect)
Height: 72 metres
Schedule:
• Beginning of construction in April 2007
• Laying of the foundation stone for the DFS tower in April 2009
• Completion of the structural work in November 2009
• Completion of construction in September 2010
Costs: around €35 miilion